Our stainless twin wall biomass flue on its free-standing steel mast being lifted upright by a mobile crane at a glasshouse site in Wisbech

Flues. Chimneys. Steelwork. Silencers.

Biomass flue and mast, Wisbech. Ø400 twin wall flue to 14 m on a free-standing mast.

We design, supply, install and test flues, chimneys, steelwork and silencers for commercial and industrial buildings across the UK and Ireland.

Project evidence

Three of our flagship jobs.

Recent work near you · All jobs on the map

Explore all projects

Ask us anything.

Our chat answers 203 common questions about our work, from prices and turnarounds to testing, documents and warranties, straight away. Anything it can’t answer goes to the team.

Grün chatReal answers from the chat
  1. How quickly do you send a price?
  2. We normally send a price within 24 hours of getting drawings or survey information.
  3. Where do you work?
  4. Across the UK and Ireland. Head office is in Exmouth, Devon, and our engineers are based in the Midlands.
  5. Do you pressure test generator exhausts?
  6. Yes. The exhaust is pressure tested on completion, so the site knows it’s sealed before the generator runs on load. You get a test report, and a certificate of conformity where applicable.Flue pressure testingData centres and standby generators
  7. What documents do I get?
  8. Calculations, drawings, technical submittals, job-specific RAMS, daily photo reports, test reports, and a completion report with photos and an O&M pack. Handover documents are normally in your project folder before the engineers get home.The paperwork at the end

The drawing turns into the job.

Our drawing. The finished flue.

Two generator exhausts at a hospital in Blackpool. Drawn by us, then built by us. See the job · Our drawings and calculations

Dimensions and the run through the wall are from our drawing.

The same riser finished, stainless steel on its wall support against the brick generator building, with the drawing’s dimensions, part labels and the hidden run through the wall marked over it
Our GA drawing of one generator exhaust riser: terminal, two lengths, 90 degree tee and wall support

Designed. Built. Tested. Signed off.

Commercial and industrial only. No domestic work.

How a flue goes together.

A twin wall flue from two boilers up through two storeys, part by part, in the order our team fits it on site.

Illustration, not a photo.

Illustration of a twin wall stainless flue on two boilers, rising through two storeys, each part numbered: lengths with test point, boiler primaries, header with a 3 degree fall to a tee cap with drain, riser base tee with cap and drain, riser lengths, strut channel and drop rod supports, base plate and wall guides on strut channel, floor fire stop and support plate, flashing and storm collar, open terminal with mesh

Before. After.

The standby generator exhaust at 1 Warrington Gardens, Maida Vale, London: the corroded old exhaust, and the new insulated twin wall exhaust our team put in. Drag the handle to compare. See the job

After: the new stainless exhaust flue with a bend off a new wall plate on the rendered wall
Before: a corroded flexible flue liner through a rusted steel plate on a rendered wall

How it works

From drawings to handover.

  1. Send drawings Or photos, or an outline Go to the form
  2. Survey Measured and photographed See an example
  3. Drawings Normally within 60 minutes of survey See an example
  4. RAMS Normally same day See an example
  5. Install Daily photo reports See the jobs
  6. Test Tested and recorded See an example
  7. Handover O&M pack See an example

Get in touch

Send drawings.

Send drawings

We’ll add you to our mailing list for occasional project news. Unsubscribe any time. See our privacy notice.

Or call 01395 201950 · [email protected]