top of page

Profile

Join date: May 7, 2025

About

0 likes received
0 comments received
0 best answers

Posts (5)

Mar 24, 20261 min
Commercial Boiler Flues, Fitzrovia, London Twin Wall Insulated Condensing Flue - Charlotte Street
GRUN Engineering is pleased to announce the award of the flue package at Charlotte Street, Fitzrovia, London. Our scope includes the design, supply, installation and testing of a twin wall insulated condensing flue system serving two gas fired water heaters. The package includes full site survey, CAD drawing, load bearing supports, condense outlets, testing, weathering and final electronic sign-off documentation. This latest award reflects GRUN Engineering’s continued growth in the delivery...

11
0
1
Mar 24, 20261 min
Contract Win: GRUN Engineering Appointed Flue and Silencer Package on 5 Chancery Lane, London
Design, supply, installation and testing of a specialist generator flue system, including silencers, expansion bellows, anti-vibration measures, weathering, testing, O&M manuals and final sign-off. GRUN Engineering is pleased to announce the award of the specialist flue package at 5 Chancery Lane, a major office redevelopment in Central London being delivered by Ardmore. This appointment reflects GRUN Engineering’s growing presence on complex commercial redevelopment schemes and reinforces...

26
0
1
Feb 11, 20261 min
Generator Flue System Upgrade – Civic Building, London | GRUN Engineering
London Generator Flue / Exhaust Extension GRUN ENGINEERING LIMITED delivered a turnkey generator flue extension for a civic building in London. The scope included the design, supply and installation of a high-temperature twin-wall system, connecting to the generator silencer and completing a secure vertical run with a bespoke support solution. The generator was housed within a 40-foot container cabin, which made access and working space tight. We provided our own access equipment and...

36
2
1

grunenguk

Admin
More actions

2026 - Grun Engineering Design

bottom of page