- 57Generator and engine exhaust jobs our team has delivered, on our project map
- 28Of them written up as case studies
- 24 hoursTo a price, from drawings or survey information
- 7 daysTo a survey, normally within a week of order
- 60 minutesTo calculations and CAD drawings after survey
Job-specific RAMS normally the same day. 2 to 4 weeks from order to install, faster when it is urgent. How we work
Case studies
Generator jobs we have done.
Real jobs with photos, flagship jobs first. The row moves on its own: hover, touch or tab into it to stop it, or swipe it along.
FlagshipData centreWorcester, West Midlands
FlagshipKing's Cross Plot S5London
FlagshipApplecross salmon farmApplecross, Scotland
FlagshipTrafford HospitalManchester, North West
FlagshipTriad BuildingBootle, North West
Flagship25 North Colonnade, Canary Wharf, phase 1London
Case study25 North Colonnade, Canary Wharf, phase 2London
Case studyBakery, NewcastleNewcastle upon Tyne, North East
Case studyThe Hoxton hotelLondon
Case studyBlossom Street, ShoreditchLondon
Case studyRoyal Bournemouth HospitalBournemouth, South West
Case studyFactoryCoventry, West Midlands
Case study1 Warrington Gardens, Maida ValeLondon
Case studyTower WorksLeeds, Yorkshire
What's in the package
Plantroom to terminal, one package.
The route, the silencer, the supports and the terminal, sized against the engine data and the acoustic target.
Supply only, install only, or supply and install.
Commercial and industrial only. We do the flue, chimney and exhaust, not the boiler or generator itself, and not domestic work.
- Route design, plantroom to terminal
- Silencer sizing and selection
- Standby, CHP and fire pump sets
- Supports, frames and brackets
- Flexible connections and test tees
- Insulation and cladding
- Testing and certificate
- O&M pack at handover
To price it, send what you have.
Drawings, photos or an outline is enough. These help:
- Engine or generatorMake, model, how many
- OutputkW or kVA each
- Outlet sizeAt the engine
- Rough routeUp and across, in metres
- New or existingAnd what is there now
- TerminationRoof, wall or stack
- SiteTown or postcode
Noise
Silencers sized to your noise limit.
Give us the limit in dB(A) and where it applies: a set distance, the nearest home or the site boundary. We work back from it to the silencer the exhaust needs, then check the silencer's back pressure against the engine's limit.
No limit set yet? We size to a grade instead.
| Grade | Typical reduction |
|---|---|
| Industrial | 12 to 18 dB(A) |
| Semi residential | Between industrial and residential |
| Residential | 18 to 25 dB(A) |
| Critical | 25 to 35 dB(A) |
| Hospital | 32 to 42 dB(A) |
Grade names aren't a fixed standard, so these are typical ranges, not promises. What a silencer really takes off depends on its size and the engine, so we check it against your limit on every job.
What we need to size it
- The engine datasheet: exhaust flow, exhaust temperature and the maximum back pressure
- The exhaust outlet size
- The noise limit and where it applies, or the grade
- The distance from the exhaust outlet to that point
We don't guess the datasheet figures. If one is missing, we ask.
Fire pumps
Fire pump and sprinkler pump engine exhausts.
A diesel fire pump or sprinkler pump engine needs an exhaust like any other engine: a route out of the pump room, a silencer, supports and a terminal. We design and install them the same way as a standby generator exhaust, sized against the engine data.
At Motel One on Blackfriars Road in London the stainless exhaust for the diesel sprinkler pump engine rises from the engine through a flexible connection, into a silencer, and on up to an elbow at high level, held on strut channel supports. The client got a photo progress report each day we were on site.

The engineering
Drawn before it is built.
Real Grün drawings. Calculations and CAD drawings normally back within 60 minutes of survey. Pick a number to see where it is on the drawing.
Our drawings
Drawn by us, for real jobs.
Real general arrangement drawings from generator and engine exhaust jobs. Calculations and CAD drawings normally back within 60 minutes of survey. Pick one to see it full size.
Client names, site addresses and title block details are blanked out.
On site
Silencers, stacks and terminals.
A Grün project manager on site and daily photo progress reports on every job.
Common questions
Asked most on generator jobs.
Anything else, call 01395 201950 or email [email protected].
-
Do you do generator exhausts?
Yes. We design and install the exhaust route, silencers and supports together, with silencer sizing calculations and design notes. -
What do you need to price a job?
Drawings, photos or an outline is enough to start. It helps to have: • appliance type and how many • output in kW or kVA • spigot or outlet sizes • rough vertical and horizontal lengths • new flue or existing chimney • termination and site location We price from that or arrange a survey. -
How quickly do you send a price?
We normally send a price within 24 hours of getting drawings or survey information. -
What testing do you do?
Pressure testing with a test report, smoke testing and CCTV surveys. Each installation includes the testing agreed for the project, with test reports and a certificate of conformity where applicable. -
Do you do supply only?
Yes. We do supply only, install only, or supply and install. -
What warranty do you give?
12 months on our workmanship, plus the manufacturer’s warranty on the materials. -
What is your lead time?
Normally 2 to 4 weeks from order to install. We can speed this up for urgent jobs.
Send drawings. Get a price.
Send the engine data and the route. A price normally comes back within 24 hours.
Free survey
Want us to come and look?
Free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked.






