Stainless steel boiler flue header and branches at high level in a plantroom

Services

Boiler flues. Cascades, headers, risers and terminals. Designed, supplied, installed, tested.

For M&E contractors, main contractors and consultants on new and replacement boiler plantrooms.

  • Supply only
  • Install only
  • Supply and install
  • 24 hours to a price, from drawings or survey information
  • 7 days to a survey, normally within a week of order
  • 60 minutes to calculations and CAD drawings after survey
  • Same day job-specific RAMS, normally
  • 2 to 4 weeks from order to install, faster when it is urgent

Normal turnarounds. How we work

What's in the package

Appliance to terminal, one package.

Gas and condensing boilers, water heaters and CHP. Single appliances, cascades into common headers and complete plantroom replacements.

Supply only, install only, or supply and install.

Commercial and industrial only. We do the flue, chimney and exhaust, not the boiler or generator itself, and not domestic work.

  • Cascades into common headers
  • Condensing boiler flues
  • Risers and external routes
  • Roof and wall terminals
  • Hangers, channel and fixings
  • Drains, tees and test points
  • Strip-out of old flues
  • Testing, certificate and O&M

To price it

What we need from you to price it.

Drawings, photos or an outline is enough to start. We price from that or arrange a survey.

Send what you have
  1. Appliance type and number Boiler, generator, water heater, how many
  2. Output kW or kVA per appliance
  3. Spigot or outlet size Diameter at the appliance
  4. Approximate lengths Vertical and horizontal runs
  5. New flue or existing chimney And what is there now
  6. Termination Roof, wall or chimney top
  7. Site location Town or postcode

The engineering

Drawn before it is built.

Real Grün drawings. Calculations and CAD drawings normally back within 60 minutes of survey. Pick a number to see where it is on the drawing.

Isometric drawing of five boilers connected into a common flue header rising to a terminal
Leisure centre, Boston. Five condensing boilers into a common header and riser.

Design and calculations

On site

Headers, risers and terminals.

A Grün project manager on site and daily photo progress reports on every job.

  • Long stainless flue header at high level with connections down to a row of boilers Header over the cascade, Bridgwater
  • Two stainless flues held off a painted brick wall on welded steel brackets at high level Risers on wall brackets, Leeds
  • Stainless flue header running above three wall-hung boilers in a plantroom Header over three boilers, Wantage
  • Tall stainless twin wall flues up black cladding on the outside of a building Risers up the cladding, Oxford
  • Two stainless steel flue terminals with weathering collars on a flat roof under a blue sky Terminals on the roof, Glasgow
  • Two large stainless flue terminals with mesh caps on a roof under a blue sky Twin terminals, Tottenham
  • Two tall boiler flue terminals against a deep blue evening sky Twin terminals at dusk, Walthamstow

Common questions

Asked most on boiler flue jobs.

Anything else, call 01395 201950 or email [email protected].

  • What do you need to price a job?

    Drawings, photos or an outline is enough to start. It helps to have: • appliance type and how many • output in kW or kVA • spigot or outlet sizes • rough vertical and horizontal lengths • new flue or existing chimney • termination and site location We price from that or arrange a survey.
  • How quickly do you send a price?

    We normally send a price within 24 hours of getting drawings or survey information.
  • Do you do supply only?

    Yes. We do supply only, install only, or supply and install.
  • What flue systems do you install?

    Twin wall insulated chimneys, insulated exhaust systems with conical or flanged joints, single wall stainless steel flues, and flexible chimney liners. We confirm the exact system, diameter and designation against your project.
  • What testing do you do?

    Pressure testing with a test report, smoke testing and CCTV surveys. Each installation includes the testing agreed for the project, with test reports and a certificate of conformity where applicable.
  • What documents do I get?

    Calculations, drawings, technical submittals, job-specific RAMS, daily photo reports, test reports, and a completion report with photos and an O&M pack. Handover documents are normally in your project folder before the engineers get home.
  • What warranty do you give?

    12 months on our workmanship, plus the manufacturer’s warranty on the materials.

Send drawings. Get a price.

Send the appliance schedule and the route. A price normally comes back within 24 hours.

Free survey

Want us to come and look?

Free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked.