top of page
AdobeStock_141402664.jpeg

Generator Exhaust Systems by Grun Engineering Limited

Grun Engineering Limited design, supply & install generator flue systems nationwide.

 

The products selected by Flue HQ Limited are always of the highest quality, manufactured by specialist distributors within the UK and Europe.

 

All of our distributors and manufacturing partners must comply with our strict qualification processes and must hold all relevant ISO registrations, ISO:9001, ISO:14001 and ISO:45001

Our generator flue systems are a modular twin wall insulated exhaust system capable of pressures up to 5,000Pa and temperatures up to 600°C.

 

Our generator systems are specifically designed to suit (diesel) engine applications such as e-generators, power gensets and uninterupted power supply.

 

Generator silencers are also available across the range of flue systems to suit all Db requirements.

 

Applications:

Gas / Diesel Engines, Emergency power gensets

Industrial processes

High pressure exhausts

High temperature plant

Advantages

Inner and Outer Wall from high quality Stainless Steel

No thermal bridges; better heat protection

Stress free expansion

Fast & Simple installation

A range of steel thicknesses available to meet all applications and specifications

Contact an engineer today by either emailing sales@gruneng.com or calling us on 07713858512

​​

generator and flue.jpg
generator specs.jpg

01

INITIAL DIAMETER CALCULATIONS AND 3D PROPOSED LAYOUT

The client will submit their proposed routes, elevations and appliance details to one of our estimators who will immediately log it on our system under one of our FHQ project numbers. We will run initial calculations based on the information that the client has submitted and generate one of our budget quotations which will be subject to a stage 2 site survey.

We usually provide a 3D layout free of charge with our quotations to show you the route that we have quoted.

02

ON-SITE PRACTICALITY STUDY, RISK ASSESSMENT AND MEASUREMENT TAKING

An experienced engineer will attend site to ensure the practicality of the project and advise on any regulations, input air into the plant room, termination requirements and general works to be completed prior to our engineers attending site. Whilst we are there we will conduct our risk assessment and take all measurements required to produce our Stage 3 CAD Drawings and RAMS.

03

3D/2D CAD DRAWING, DIAMETER CALCULATIONS AND RAMS SUBMITTED FOR APPROVAL

From the information obtained from our practicality study and on site assessment we will generate 3D CAD drawings, our Risk Assessments and Method Statements and Diameter Calculations that we will issue to the client, and to our installation engineers as a guide to their installation. 

All of the documents will need to be approved by the client/project engineer prior to our engineers attending site inline with our Stage 4 process.

04

MATERIALS DELIVERED TO SITE, INSTALLATION ENGINEERS DEPLOYED

Once approval has been granted by the client, we will get to work perfecting our materials list from the drawing already provided. An installation date will be agreed upon inline with the client's programme of works. Our project managers will closely monitor the progress of our on site engineers and will receive daily reports of progress and issues, should they arise.

05

SNAGGING, TESTING, CERTIFICATE OF CONFORMITY AND PROJECT SIGN OFF SHEET

Upon completion of the project, the system will be smoke tested and/or pressure tested dependant upon the clients requirements. The client and main contractor will be asked for their approval and a CoC and/or project sign off sheet will be issued outlining our 10 year product warranty.

My project-1 (2)_edited_edited.png

Emergency Generator Flues

Made simple...

Industrial & Commercial Flue Specialists

Design • Supply • Install • Commission • Test

 

Engineered stainless systems for generators, CHP, biomass, water heaters and boilers—UK-wide

     Free site survey & fixed-price quote

     Compliance to BS EN standards & manufacturer requirements

     Rapid lead times with UK stock & experienced install teams

Get your free site survey

We'll call you back within 2 working days

No spam. We only use your details to handle your enquiry.

Subscribe Form

©2019 by T.J.Meakin

bottom of page